Contact

Start with the unit that is costing you the most.

The most useful first conversation is about one unit, one grade or product family and one measurable problem. Tell us which, and we will tell you what shadow mode would need and what it would baseline.

A person reads itNo drip campaignDesign partners first

run_scn_01 · agent graph · scenario 10 nodes · 1 approval gate
01 · orchestrator order.receive ✓ SUCCEEDED 02 · orchestrator twin.simulate ✓ SUCCEEDED 03 · reform_synth loop.control ✓ SUCCEEDED 04 · react_evap evaporate.control ✓ SUCCEEDED 05 · granulate granulate.control ✓ SUCCEEDED 06 · coat_condition condition.cool ✓ SUCCEEDED 07 · defect_inspect inspect.granules ✓ SUCCEEDED 08 · orchestrator approve.human ◆ APPROVAL 09 · blend_bag blend.bag ✓ SUCCEEDED 10 · quality_conf release.genealogy ✓ SUCCEEDED

Illustrative scenario: Complex run · one urea granulation campaign from synthesis gas to bagged lot · ammonia loop, urea synthesis and evaporation, granulator, dryer and cooler, NPK bagging line. Not a measured run.

Contact

Tell us about your unit

The form opens your mail client with the message addressed to hello@nitreum.com. Nothing is stored on this site.

Or write directly to hello@nitreum.com.

Routes

Design partners
hello@nitreum.com
Partnerships
hello@nitreum.com
Careers
hello@nitreum.com
Security pack
hello@nitreum.com

One mailbox while the team is small. Named addresses follow as people join publicly.

What to include

  • The unit and the grades or products it runs
  • The systems on it: DCS and APC, historian, analyzers, emissions sensors, granulation control, lab, MES, cameras
  • The number you would baseline
  • Who would approve a pilot, including process safety
Reasons

Why people get in touch

Producers

A design-partner pilot

One unit, one number, shadow mode first.

Vendors

A partnership

Licensors, control-system, analyzer, vision and MES vendors who sell into fertilizer complexes.

HSE and IT/OT

The security pack

Design posture, data flows, safety boundaries and roadmap dates.

Engineers and technologists

A role

Vision, OT integration, simulation or fertilizer process engineering.

Run timeline

What we would be deploying

Every Nitreum run is an ordered, inspectable sequence. This is run_scn_01, an illustrative scenario: Complex run · one urea granulation campaign from synthesis gas to bagged lot · ammonia loop, urea synthesis and evaporation, granulator, dryer and cooler, NPK bagging line. Scenario complete · lot inside spec · one human approval on the ammonia loop.

run_scn_01 scenario · not measured SUCCEEDED
  1. 01 order.receive SUCCEEDED 0.8 s

    Complex Orchestrator · Pulled the grade spec, the nutrient target, the granule spec for size distribution, hardness and moisture, the emissions permit limits, the safety-instrumented envelope and the standing changeover window from the plant MES and the historian; locked the target envelope for the campaign.

  2. 02 twin.simulate SUCCEEDED 41 s

    Complex Orchestrator · Simulated 24 candidate loop, evaporation, granulation and sequencing plans on the Nitrotwin as-produced complex twin; ranked them on conversion, energy per tonne, predicted granule distribution, recycle ratio, emissions margin and takt, and discarded every candidate that thinned the safety or permit margin.

  3. 03 loop.control SUCCEEDED continuous

    Reform-and-Synthesize · Held ammonia-loop conversion and reformer temperature inside the approved envelope from live loop telemetry and the conversion model, trimming setpoints toward the lowest energy per tonne the plan allowed; purge and trip settings were read, never written.

  4. 04 evaporate.control SUCCEEDED continuous

    React-and-Evaporate · Held urea melt concentration at the granulation target from the online concentration analyzer and the evaporation model, moving evaporator setpoints inside the recipe window rather than waiting for the next lab assay.

  5. 05 granulate.control SUCCEEDED continuous

    Granulate-and-Prill · Tuned recycle ratio, spray and bed temperature from the live Granvis size distribution and moisture signal, each move validated on the twin first; the granule distribution stayed inside the spec band while recycle trended down.

  6. 06 condition.cool SUCCEEDED continuous

    Coat-and-Condition · Held dryer and cooler outlet temperature and moisture inside the storage window and set the anti-caking coating rate to the predicted caking risk for the product and the season; nothing moved outside the conditioning envelope.

  7. 07 inspect.granules SUCCEEDED continuous

    Defect-and-Inspect · 12 camera streams at the plant edge: granule size and shape, dust, caking precursors and broken prills on the granulator discharge, cooler and bagging belts; two dust spikes were attributed to one spray nozzle and Granulate-and-Prill corrected it inside its window.

  8. 08 approve.human APPROVAL 2 m 14 s

    Complex Orchestrator · The lowest-energy candidate wanted a purge-rate change on the ammonia loop beyond the bounded envelope. Held for the shift process engineer and the process-safety approver, who approved a smaller step with the safety-instrumented envelope untouched and a tighter review interval.

  9. 09 blend.bag SUCCEEDED continuous

    Blend-and-Bag · Held the NPK blend ratio to the nutrient spec from Granvis nutrient sensing, checked segregation on the belt and held bag weight to target; three overweight bags were attributed to one dosing gate and the gate was trimmed inside the approved window.

  10. 10 release.genealogy SUCCEEDED 1 m 10 s

    Quality-and-Conformance · Lot released: conversion and energy per tonne, melt concentration, granule distribution, hardness and moisture, nutrient assay, emissions readings, inspection events, bag weights and every human decision written to the lot genealogy and checked against spec and permit.

First phase

What an engagement looks like

Gates, not dates. Each stage starts when the previous one has proven its number against your own baseline. A paid pilot runs 90 to 120 days per site with the baseline, shadow mode, assist mode and the ROI gate agreed up front.

  1. Design partners. Two to four producers instrument the wedge workflow in shadow mode. We measure the baseline on energy, off-spec and emissions from your own historian, assays and meters.
  2. Assist mode. The agent recommends synthesis, granulation or blend moves and predicts conversion, granule quality and emissions; your engineer approves. Accuracy and ROI are proven against the baseline.
  3. Graduated autonomy. Low-risk synthesis and granulation loops move to bounded automatic control with adaptive setpoints. Exceptions escalate to a person.
  4. Expansion. Adjacent units are added within the same complex, then across sites.
Pricing

Priced per unit, per complex, per group

Land on one workflow with a measured baseline. Expand by unit, module, site and autonomy stage. Outcome components available on energy, emissions and off-spec.

Unit $22,000 per synthesis or granulation unit / month

Synthesis or granulation control, or granule-sensing AI, for one unit. For producers validating ROI on the wedge.

  • One unit, one agent module
  • Plant-edge inference node
  • Connectors to the unit's DCS or APC, analyzers and MES
  • Review console, alerting, audit log and genealogy
  • Shadow and assist stages, then bounded autonomy after the agreed gates
Start a pilot
Enterprise Custom land $900k – $12M ACV

Fertilizer groups standardizing on Nitreum across sites, with custom product, process and emissions models.

  • Multi-site plant-edge fleet
  • Custom product, process and emissions models
  • SLAs and dedicated support
  • Outcome-based components on energy, emissions and off-spec
  • On-prem or private-cloud deployment
Contact us

Annual prepay

A 15 to 20% discount for annual prepayment.

Multi-year

Enterprise agreements with usage ramps tied to throughput.

Outcome components

A share of measured energy, emissions or off-spec improvement on the highest-value workflows.

Usage

Per-tonne, per-unit or per-action metering above plan limits.

Enterprise

Standardize autonomy across the group

One policy model, one audit trail and one set of yield, energy, emissions and granule-quality benchmarks across every complex in the group, with each site's recipes, process settings and emissions models kept private to that site.

Talk to us Enterprise details

  • Multi-site plant-edge fleet with shared model governance
  • Custom product, process and emissions models per site
  • SSO and role-based access, named approvers (roadmap, 6 to 12 months)
  • Model versioning, validation reports and rollback
  • On-prem or private-cloud deployment
  • SLAs and outcome-based components on the highest-value workflows
Guardrails

An agent that can move a setpoint needs a leash

Nitreum writes to production equipment in a plant that handles ammonia. Every capability is scoped, every write is policy-checked, every output is cited, and every action is written to an append-only audit log the plant owns.

  • Bounded action space. Each agent can only write to an explicit tag allow-list, through approved DCS or APC interfaces, inside per-tag rate and magnitude limits, at the autonomy stage the plant has set.
  • Safety systems are read, never written. Safety-instrumented systems, interlocks, trip settings and emissions permit limits stay with the plant's process-safety program and the people who own it.
  • Policy engine before every write. Autonomy stage, safety envelope, interlock state, grade, shift and operator presence are evaluated before a setpoint moves. Any ammonia-loop move beyond the envelope waits for a named approver.
  • Grounded and cited. Every recommendation carries a citation to the spec, procedure or permit it relied on. Retrieval is tenant-isolated and permission-aware.
  • Immutable audit log. Append-only, exportable and retained on the plant's own storage, aligned to the plant's quality, emissions and process-safety record-keeping.
  • Hard fallback. If the edge node, the network or a model stops, the plant keeps running on its existing DCS, APC and safety systems.
  • Tenant and IP isolation. Recipes, process settings and plant IP never cross a customer boundary. On-prem and plant-edge deployment available.

Assurance posture

Assurance and certification status
ItemScopeStatus
SOC 2 Type I readinessCloud control plane QUEUED Roadmap, first 6 months
SOC 2 Type IICloud control plane QUEUED Roadmap, 6 to 12 months
Process-safety and emissions proceduresGrounding and record-keeping RUNNING Design basis for retrieval and the audit log
Per-tenant isolationData, memory, models RUNNING Design rule
On-prem and plant-edge deploymentIP- and safety-sensitive sites RUNNING Design option

Nitreum supports your process-safety, quality and emissions records. It is not a certification and it does not replace your safety program or management of change.

Read the security overview

From the control room

Who this is built for

The three people in a fertilizer complex whose week changes when the process runs itself, and what each of them needs from Nitreum.

Economic buyer

Complex or Plant Operations Manager

Owns production rate, quality, yield and off-spec, energy, emissions and safety. Wants autonomous, higher-yield, lower-energy, lower-emissions production and a number that justifies the spend.

Champion

Process or Production Engineer

Owns synthesis, evaporation, granulation and blending recipes and process windows, energy and yield. Approves and corrects the agents in assist mode; those corrections train the models.

Approver

Sustainability, HSE and Energy Lead

Owns energy, CO2, NOx and ammonia-slip emissions, process safety, environmental compliance and the license to operate. Needs every action grounded, cited and written to an immutable record.

IT/OT and process safety approve the deployment; safety is a gating stakeholder for ammonia. There are no customer quotes on this site yet; design partners will speak for themselves when they choose to.

Integrations

It speaks plant, not cloud

Nitreum reads and writes through the systems already in the control room. No parallel historian, no new HMI, no rip-and-replace. Connectors are built against each design partner's stack first; long-tail integrations are out of scope for the first release.

DCS, APC and historian

Reformer, ammonia loop, reactor and evaporator control and the plant historian

Setpoint reads, guarded writes, safety systems untouched

Granulation and prilling control

Granulator, prill tower, dryer, cooler and coating drum controls

Recycle, spray, temperature and coating setpoints inside windows

Online analyzers

Nutrient, moisture and concentration analyzers, NIR and granule analyzers

Continuous quality state, fused at the edge

Emissions sensing

CO2, NOx and ammonia-slip sensors and permit records

Read and verified; excursions predicted, limits never optimized against

Blending and bagging

NPK blender, dosing gates, bagging and loading lines

Ratio and weight setpoints inside approved windows

Cameras and robots

Fixed cameras on granule, belt and bagging stations; Isaac-driven palletizing and loading cells

Frames, defect events, bounded handling

Plant MES, LIMS and quality

Orders, grade specs, lab assays, lot genealogy

Targets in, release records out

Identity (planned)

SSO and role-based access; SOC 2 on the roadmap

Named approvers, scoped roles

See all integrations

FAQ

Straight answers

The questions complex operations managers, process engineers and HSE leads ask in the first meeting.

Only at the autonomy stage your plant has set, and only to an explicit allow-list of low-risk loops inside documented limits, through the approved DCS or APC interfaces. Every design partner starts in shadow mode, where Nitreum predicts and writes nothing. Assist mode follows, where a process engineer approves each recommendation. Bounded autonomy on granulation, conditioning and blending loops comes after the safety and ROI gates agreed up front.

Get started

Or just send the unit

A sentence about the unit and the number is enough to start.